Do I need to supply an as-built grading survey?

Applications for new construction or expansions of existing footprints will be required to provide an as-built grading survey if one of the following criteria apply:

  • The new construction includes proposed grading that will alter (or has the potential to alter) the drainage patterns onto adjacent property or
  • The new construction will be within ten feet of any lot line or
  • The proposed new construction is being built in conjunction with a variance or conditional use permit subject to specific grading or screening requirements or
  • The proposed new construction is being built in accordance with an approved master grading plan

If you have questions about the New Brighton Survey Policy, please email Ben Gozola.

Show All Answers

1. Do I need a survey when submitting a land use application?
2. Do I need a survey for my residential building project?
3. Do I need a survey for my commercial building project?
4. Do I need a foundation survey?
5. Do I need to supply an as-built grading survey?
6. Are there minimum survey requirements?