Contractor Applications
Notice - Due to the high volume of permit applications, your permit request may take up to 15 days to be issued.
Please beware, a permit is not issued until it has been paid for and reviewed.
The City of New Brighton is currently not able to accept paper applications. Please register and apply via our online portal - visit this guide for instructions. You only need to register once. If you already have a linked username, sign in when prompted.
Please: do not apply for a permit as a homeowner if you are a contractor. If the application form says homeowner, refer to the contractors' guide to complete your account registration.
If you need your PIN Number you can request it. Depending on the day/time the request is sent, and the availability of staff, obtaining your unique PIN Number can take anywhere from a few minutes to a few days, so please be patient.
Please call 651-638-2050 on weekdays during business hours if you have any questions.
More Information:
- Email Jeremy Wells with code questions
- Email the Building Department with permit questions
- Inspections
- Project Information
Have Questions?
- Code Questions: email Jeremy Wells
- Permit Questions: email the Building Department
- If you have electrical questions, or to schedule, visit Tokle Inspections (preferred) or call 763-754-2983 between 7 am and 8:30 am
SAC Determinations
All commercial building permits will need to have a SAC determination completed before issuance. SAC is a one-time fee that the Metropolitan Council charges local governments when a residential, commercial, industrial or institutional property first connects to the regional wastewater (sewer) system or a business grows or changes and creates more potential demand on the wastewater system. More information can be found on the Metropolitan Council's website.
Backflow Devices
It is the responsibility of the owner of a testable backflow device to have it tested at the time of installation and annually thereafter. It is the responsibility of the plumbing contractor to notify the owner that testing needs to occur on this schedule. Please reference this Plumbing Backflow Fact Sheet (PDF) if you have any questions.
Have Questions?
- Code Questions: email Jeremy Wells
- Permit Questions: email the Building Department
- If you have electrical questions, or to schedule, visit Tokle Inspections (preferred) or call 763-754-2983 between 7 am and 8:30 am
Visit the Fire Permits page for all information on obtaining a fire permit.
Sign permits are required for construction of new signs and sometimes the modification of existing signs. Some temporary signs also require a permit. Please ensure the appropriate permit is complete prior to use of either a permanent or temporary sign. If you have any questions or concerns related to signs, please email Scott Gigrich, Code Enforcement Inspector or call 651-638-2061.
The City of New Brighton is committed to being proactive in facilitating the use of alternative energy sources like solar panels. The solar industry is booming in Minnesota, and it is positioned for continued growth. Solar energy can be used to generate electricity to provide hot water and to heat, cool, and light buildings and homes. Solar power is generated with the use of photovoltaic panels. "Photovoltaic" means that sunlight is used to generate electricity. Solar installations range in size and can be roof-mounted or ground-mounted. New Brighton participates in SolSmart, a national program that provides free technical assistance to help cities make it faster, easier, and more affordable to go solar.
How to Apply
Please submit an online permit along with the required plan documentation through one of the following links. These permits are required for both roof-mounted and ground-mounted solar systems. Small solar photovoltaic (PV) projects 10 kilowatts or less have a turnaround time of less than 3 business days.
The Rooftop Solar Checklist page and Solar Photovoltaic Inspection Checklist page describe the process and necessary information for obtaining a solar permit and solar inspection, but they are not required for a solar permit. Please reference them if you have any questions about plan documentation or inspections.
Have Questions?
- Code Questions: email Jeremy Wells
- Permit Questions: email the Building Department
- If you have electrical questions, or to schedule, visit Tokle Inspections (preferred) or call 763-754-2983 between 7 am and 8:30 am
Solar Zoning in New Brighton
Information coming soon
Additional Resources
- Understanding your solar resource: The Minnesota Solar Suitability App can help you understand the solar potential of a particular site in the state. This tool displays the solar potential for every spot in the state of Minnesota.
- Community Solar Gardens: Community solar gardens are centrally-located solar PV systems that provide electricity to participating subscribers. Learn more about community solar gardens. Find out more about solar garden operators from Xcel Energy's website under "Step 2: Contacting a Solar Garden Operator."
- Financing: Residents interested in installing solar PV on their property can access financing through the Center for Energy and Environment. See more information. Businesses can finance solar energy projects through a tool called "Property-Assessed Clean Energy", or PACE, in which energy-saving measures are paid for through property taxes. This can work well even for businesses that rent their space. Find more information on PACE financing.
For more information on additional solar-related topics, check out these resources:
Understanding the City of New Brighton's 2040 Comprehensive Plan Solar Objective & Policies
Objective: LU 10.0 - To be proactive in facilitating the use of alternative energy sources and ensure reasonable access to direct sunlight for areas that will undergo redevelopment over the next 20 years.
Policies:
- LU 10.1 Protect existing solar collectors from shading by development and vegetation on adjoining properties.
- LU 10.2 Consider solar access in the formulation of plans for street landscaping and private planting plans.
- LU 10.3 Encourage development adjacent to existing residential areas which would not obstruct sunlight on the south side of structures between the hours of 10 am and 2 pm on a clear winter solstice day (December 21).
- LU 10.4 Encourage the use of solar energy in future housing developments through such programs as the "Energy House."
- LU 10.5 Consider variances to ordinance regulations, consistent with state statute, which will create opportunities for solar access employment.
- LU 10.6 Encourage and support educational programs and research that focuses on alternative or renewable energy systems and sources.
- LU 10.7 Work with Clean Energy Resource Teams (CERTS) on potential projects and future programs.
- LU 10.8 Work towards recognition for Best Practices within the Green Step Cities Program for Renewable Energy.
- LU 10.9 Explore opportunities/programs for commercial/industrial property owners to take advantage of robust solar development potential of large rooftop areas.
- Excavation/Grading (PDF)
- Load Limit (PDF)
- Mobile Home (PDF)
- MS4 (City) (PDF)
- Right of Way
- Sewer and Water
- Storage Tank (PDF)
- Street and Curb Cut (PDF)
- Sump Pump (PDF)
If you have questions, please call 651-638-2050.